Specifications include, but are not limited to: Resurfacing, Striping, and Sealing of Fernley High, Dayton High, Silver Stage High, & Yerington High Schools Track and Field Synthetic Surfaces The scope of work includes: -Install a polyurethane synthetic track resurfacing system compatible with the existing synthetic surfaces that make up the facilities track and field complexes at Fernley High School, Dayton High School, Silver Stage High School, and Yerington High School in Lyon County Nevada. -The goal of this system is to return these complexes to like new condition with the same compatible materials equivalent or better. -This scope must include any work necessary to the sub surfacing to repair cracks, blemishes, or adhesion concerns or situations. -The installer must be certain the surfaces to be coated are free of contaminants that may impair adhesion of primers or product. -The wear coat, seal coat, and EPDM granules must all match the existing pigmentation of each track. -Line striping and layout must meet current NIAA and NFSHA rules (changes have been made since existing markings) and be of the same existing colors.