Specifications include, but are not limited to: Project 1: Ridge Road A. At the beginning of the intersection of Ridge Road and Kennebec River Road (Rt. 16), provide and properly place 9.5 mm hot mix asphalt material 1,600 feet in length, 35 feet in width an average of 'A inch in depth to restore the proper 2% cross slope and crown the existing surface (approximately 170 tons) Continue to provide and properly place 9.5 mm hot mix asphalt shim asphalt shim material 6,215 feet in length, 25 feet in width an average of % inch in depth to restore the proper 2% cross slope and crown of the existing surface (approximately 473tons) B. Beginning at the intersection of the Pleasant Ridge Road and Kennebec River Road (Rt. 16), provide and properly place 12.5 mm hot mix asphalt surface material 1600 feet in length, 35 feet in width and 1.5 inches in depth a 2% cross slope (approximately 512tons). Continue to provide and properly place 12.5 mm hot mix asphalt surface material 6,215 feet in length, 25 feet in width and 1.5 inches in depth at a cross slope of 2% (approximately 1422 tons) Project 2: Bluff Road A. Beginning at the intersection of the Ridge Road and proceed west 600 feet to the top of the hill, provide and properly place 12.5 mm hot mix surface asphalt material 600 feet in length, 22 feet in width 1 and 'A inch (1.5") in depth to restore the proper 2% cross slope and crown of the existing surface (approximately 121 tons).