Specifications include, but are not limited to: Project involves the Delaware Army National Guard Electrical Distribution System upgrades. The existing pole top distribution system will move to underground through an existing conduit pathway to a new 150KVA Transformer to accommodate future site work, new buildings, equipment and spare capacity. Additionally, the electrical poles on the front end of the site will be removed to make room for future site work and aesthetics. The site will be furnished with a 60KW Generator for Standby Power. The 60KW generator will be fitted with a 200A Automatic Transfer switch that will provide power to 2 standby electrical panels within the FMO Building and EST Building. Contract documents may be obtained by mailing a check to the office of Tetra Tech, Inc., 240 Continental Drive, Suite 200, Newark, DE 19713, if interested in purchasing send an email to ier.DENG@tetratech.com/ tabi.heath@tetratech.com.