Specifications include, but are not limited to: 3.4.1. CSN will occupy the site during the entire period of construction. 3.4.2. Notify CSN in writing when materials which may cause odors will be used, applied, or mixed nearby or directly to the existing building during normal operating hours. 3.4.3. Cooperate with CSN to minimize conflict, and to facilitate CSN’s operations. Schedule the Work to accommodate CSN’s needs. 3.4.4. The Contractor shall provide sufficient manpower and equipment during each portion of the Work to meet the various completion deadlines. 3.4.5. Any conflict / discrepancy found between the Scope of Work in the Request for Proposal/Invitation for Bid, purchase order, or contract shall be brought to the attention of CSN. 3.4.6. The Contractor will coordinate all work with CSN’s Construction Manager assigned to the project. This will include any coordination efforts with any utility companies, other trades, CSN in-house personnel, etc. 3.4.7. The Contractor shall carefully inspect the site and verify all conditions and dimensions prior to proceeding with any work described herein. The Contractor shall notify CSN’s Representative of any discrepancies with these documents prior to beginning any construction. 3.4.8. Written dimensions shall take precedence over scaled dimensions and shall be verified on the job site. Any discrepancies shall be brought to the attention of CSN’s Representative prior to the commencement of work. 3.4.9. CSN’s Architect/ Engineer shall decide all questions relating to the interpretation of the drawings and the acceptable fulfillment of the contract documents. 3.4.10. The Contractor shall provide finished as-builts upon request. 3.4.11. The Contractor shall assign a project manager for the project to provide CSN with a single point of contact.