Specifications include, but are not limited to: Over the course of 2020, the Town of Washington worked with partners and the Winooski NRCD to advance a preliminary design to remove Hands Mill Dam and restore the upstream channel for hazard mitigation, aquatic organism passage, stream equilibrium, and water quality. The full project scope will include 100% stream bed and bank remediation, floodplain restoration, and historical documentation. Project outputs from Phase 1 - Preliminary Design (30%) can be found on the project site page: winooskinrcd.org/handsmilldam. In Phase 2, the Town of Washington, VT is requesting that consulting engineers who are experienced in dam removal design and licensed to practice in Vermont submit proposals for a final (100 percent) design for removal of Hands Mill Dam in Washington, VT