Specifications include, but are not limited to: Crack sealing, plant mix surfacing mill and overlay in isolated sections (total length of 1.3 miles), microsurfacing, and minor ADA upgrades on the Lakeside ? N & S project in Lake & Flathead Counties. Gravel and plant mix surfacing will be placed on an existing gravel pullout to construct a proposed MCS scale site at RP 91+0.0. In addition, centerline and shoulder rumble strips, signing, delineation and pavement markings will be included. The project begins at RP 92+0.9 just north of Presbyterian Camp Road and extends northerly approximately 9.1 miles along National Highway Route 5/US 93, north and south of Lakeside, to RP 102+0.0, approximately 450? south of the Old U.S. Highway 93 intersection. The Lake/Flathead County Line is at RP 93.526.