Specifications include, but are not limited to: The proposed work under the Base Bid includes construction of a pre-fabricated expansion to the existing solids handling building at the Bozeman Water Reclamation Facility; installation of a new screw press and conveyor system; HVAC improvements to the solids handling building; installation of a new bar screen in the existing headworks building; and ancillary electrical and instrumentation and controls work. The new screw press and new bar screen major equipment will be owner furnished. The proposed work under Bid Alternate A includes the installation of a new positive displacement pump, polymer system, and associated piping modifications to allow both the existing and new screw press to operate in parallel. The proposed work under Bid Alternate B includes the installation of a new transverse conveyor in the truck load-out to accommodate solids from the existing and new conveyor systems. The proposed work under Bid Alternate C includes lengthening the planned truck bay building addition. In this Alternate C the truck bay would be expanded from the base bid dimensions of 20’ x 40’ to a dimension of 20’ x 80’ in order to house two loading trucks.