Specifications include, but are not limited to: The City of Manchester Department of Public Works is requesting qualifications from Professional Engineering and Design Consultants for the S WILLOW STREET AND WESTON ROAD INTERSECTION IMPROVEMENTS. The proposed plan is to improve traffic flow at the intersection and on the corridor by adding a northbound right turn lane on S Willow Street at Weston Road and modifying lane utilization on Weston Road at the S Willow Street (State Route 28) intersection. To accomplish this work, it is anticipated to include traffic signal modifications (new mast arm, new vehicular and pedestrian signals, new control cabinet, new detection, conduit, and wiring), roadway widening and paving, relocation of sidewalk, utility/fire hydrant/catch basin relocation, construction of new ADA compliant curb ramps, signage and striping modifications, and alterations to adjacent sites.