Specifications include, but are not limited to: DIVISION23-MECHANICAL23 0000Basic Mechanical Materials and Methods......................................................................1-1723 01 00Operation and Maintenance for HVAC Systems ...........................................................1-22301 04Preparation for HVAC Commissioning by Contractor.....................................................1-1123 01 05Commissioning of HVAC Systemsby Commissioning Agent.......................................1-623 05 13Common Motor Requirements for HVAC Motors...........................................................1 -323 05 14Variable Frequency Drives..............................................................................................1-723 05 19Meters and Gauges for HVAC Piping ............................................................................1-523 05 23General-Duty Valves for HVAC Piping ...........................................................................1-523 05 29Hangers and Supports for HVAC Piping and Equipment ..............................................1-5 23 05 48Vibration Controls for HVAC Piping and Equipment.......................................................1-723 05 53Identification for HVAC Piping and Equipment ..............................................................1-623 05 93Testing, Adjusting and Balancing for HVAC ..................................................................1-1023 05 95Contractor System Preparation for Testing and Balancing ...........................................1-523 07 00HVAC Piping andEquipment Insulation.........................................................................1-1123 21 13Hydronic Piping and Accessories...................................................................................1-823 21 23Hydronic Pumps..............................................................................................................1-523 52 33Condensing Boiler...........................................................................................................1 -523 64 23Air-Cooled Scroll Water Chillers ....................................................................................1-8 Rev. 01/04/21 PROJECT MANUAL FOR Briscoe Elementary School 2015 S Flores St, San Antonio, TX 78204 (210) 228-3325OWNER:San Antonio Independent School District 141 Lavaca Street San Antonio, Texas 78210 (210) 554-2280OWNER’S REPRESENTATIVE: Construction & Development Services Department 1207 West Summit Ave., Suite 307 San Antonio, Texas 78201 (210) 554-2420MECHANICAL/ELECTRICAL ENGINEER:Silber and Associates Chester P. Allen, P.E., 8610 Broadway, Ste. 415 San Antonio, TX 78217 (210) 826-6392Date: January 11, 2021 2021 Chiller Replacement at TOC-1Briscoe Elementary SchoolTable of ContentsS&A #2020.034SAN ANTONIO INDEPENDENT SCHOOL DISTRICTSPECIFICATIONSGUIDE2021 CHILLER REPLACEMENT AT BRISCOEELEMENTARY SCHOOLTABLE OF CONTENTS (TOC) DIVISION 0-SOLICITATION INSTRUCTIONS00020Request for Proposals ...................................................................................................1-100100Instructions to Offerors....................................................................................................1-900300Proposal Form.................................................................................................................1-400302Supplemental Bid Form..................................................................................................1-100306Contractor’s Qualification Statement..............................................................................1-700307Representation and Certification Form...........................................................................1-300308Small, Women, and Minority Business Enterprise (SWMBE)Program Identification Form...........................................................................................1-500309Contractor/Subcontractor Criminal Background Certification Formswith Instructions..............................................................................................................1-400310Out of State CertificationForm.......................................................................................1-100311House Bill89 Verification of Vendor Form (TX Gov’t Code § 2270.001)........................1-100312EDGAR Compliance Form..............................................................................................1-500313Conflict of Interest Questionnaire (CIQ)..........................................................................1-200500AIA-A101-2017 Standard Form of Agreement Between Owner and Contractor............1-700700AIA-A210-2017 General Conditions of the Contract for Construction............................1-6400800Supplementary Conditions..............................................................................................1-20Attachment A -Labor and Wage Standards...................................................................1-8DIVISION 1 -GENERAL REQUIREMENTS01010Summary of Work...........................................................................................................1-201027Applications for Payment................................................................................................1-401030Alternates........................................................................................................................1-101035Modification Procedures.................................................................................................1-201040Coordination....................................................................................................................1-301042Mechanical and Electrical Coordination..........................................................................1-701045Cutting and Patching.......................................................................................................1-401050Field Engineering............................................................................................................1-201200Project Meetings.............................................................................................................1-201300Submittals.......................................................................................................................1-601400Quality Control................................................................................................................1-201410Testing Laboratory Services...........................................................................................1-301421Reference Standards and Definitions.............................................................................1-2401500ConstructionFacilities and Temporary Controls.............................................................1-801660Materials and Equipment................................................................................................1-801770Contract Closeout...........................................................................................................1-401720Project RecordDocuments.............................................................................................1-301730Operation and Maintenance Data...................................................................................1-601740Warranties.......................................................................................................................1-2DIVISION 2 THRU 22-NOT USEDDIVISION23-MECHANICAL23 0000Basic Mechanical Materials and Methods......................................................................1-1723 01 00Operation and Maintenance for HVAC Systems ...........................................................1-22301 04Preparation for HVAC Commissioning by Contractor.....................................................1-1123 01 05Commissioning of HVAC Systemsby Commissioning Agent.......................................1-623 05 13Common Motor Requirements for HVAC Motors...........................................................1 -323 05 14Variable Frequency Drives..............................................................................................1-723 05 19Meters and Gauges for HVAC Piping ............................................................................1-523 05 23General-Duty Valves for HVAC Piping ...........................................................................1-523 05 29Hangers and Supports for HVAC Piping and Equipment ..............................................1-5 2021 Chiller Replacement at TOC-2Briscoe Elementary SchoolTable of ContentsS&A #2020.03423 05 48Vibration Controls for HVAC Piping and Equipment.......................................................1-723 05 53Identification for HVAC Piping and Equipment ..............................................................1-623 05 93Testing, Adjusting and Balancing for HVAC ..................................................................1-1023 05 95Contractor System Preparation for Testing and Balancing ...........................................1-523 07 00HVAC Piping andEquipment Insulation.........................................................................1-1123 21 13Hydronic Piping and Accessories...................................................................................1-823 21 23Hydronic Pumps..............................................................................................................1-523 52 33Condensing Boiler...........................................................................................................1 -523 64 23Air-Cooled Scroll Water Chillers ....................................................................................1-8DIVISION24-NOTUSED DIVISION25-MECHANICAL25 00 00Building Automation System -Direct Digital Controls.....................................................1 -172500 00AAppendix A Cabling Standards.......................................................................................1 -37DIVISION26-ELECTRICAL26 05 00Basic Electrical Materials and Methods .........................................................................1-826 05 14Low-Voltage Electrical Power Conductors and Cables .................................................1-526 05 26Grounding.......................................................................................................................1-626 05 33Raceways and Boxes......................................................................................................1-726 05 53Electrical Identification....................................................................................................1-626 05 73Overcurrent Protection System.......................................................................................1-826 28 13Fuses..............................................................................................................................1-226 28 16Disconnect Switches and Circuit Breakers ....................................................................1-4