Specifications include, but are not limited to: The work covered by this contract includes ASBESTOS ABATEMENT for all buildings described in the summary of work. The Contractor will submit a detailed written Not to Exceed cost estimate and schedule of activities including any factors that could affect the cost or schedule, for all work requested by the Owner that exceeds $300.00. The not to exceed cost estimate will be based on this contracts labor and material rates, and the following: State agencies at locations in the Treasure Valley and areas within the state where the contractor has a physical presence, may use this contract if mutually agreed upon by the Contractor and the Owner. All billings will be sent directly to the Agency requesting the work. Copies of all payment requests will be sent to the Owner in order to maintain a record of the total Contract expenditures. The buildings covered in this service agreement have been constructed and maintained under applicable code requirements. The Contractor will maintain the integrity of the buildings as it applies to these code requirements. The Contractor shall be properly licensed and shall have sufficient licensed personnel and equipment to perform the work. The Contractor will submit a detailed written Not to Exceed cost estimate and schedule of activities including any factors that could affect the cost or schedule, for all work requested by the Owner that exceeds $10,000.00. The not to exceed cost estimate will be based on this contracts labor and material rates, and the following: Scheduling The Contractor shall coordinate all activities that effect building operations with the Division of Public Works 48 hours prior to commencing work. All work effecting individual agencies will be coordinated in advance by the Contractor with the affected agency. Equipment All equipment required to perform the work will be provided by the Contractor. State owned equipment will not be used by the Contractor. Specialty equipment may be paid at invoice cost plus the contracted percentage markup as defined in Exhibit A. Specialty equipment will include, but is not limited to, large scaffold, generators, lifts, excavating equipment, cranes, portable toilets, dumpsters, etc. and/or other specialty equipment, preapproved by the Owner. Specialty equipment should be included in cost estimates for proposed scopes of work, by project. Material and Supplie