Specifications include, but are not limited to: Construction Manager-At-Risk shall perform and coordinate all pre-construction and construction services for the following Project as a single package or in multiple packages as determined during the Pre-constructionphase:2.2.1.1Fire AlarmReplacement: Complete replacement of fire alarm system panels, AVs and fiber to all buildings, campuswide.2.2.1.2HVAC, Hot Water Systems: Replace domestic boilers throughout campus and replace one chiller for Building 633 and replace AHU units Building 637. Replacement of domestic / heating boilers includes but is not limitedto:Buildings555 -1 boiler631 -2 boilers639 -1boiler643 -1boiler781 -1 domestic boiler782 -3 heating boilers (serves 781, 784, and 785)784 -1 domesticboiler785 -1 domesticboiler795 -2 boilers 2.2.1.3Building 798 is being demolished separately from this contract. The following equipment may be available for re-use: (i) A new chiller was recently installed in Building 798 and is being stored; (ii) Three refrigeration condensers and a Hurst Steam Boiler; and (iii) other existing components from demolished Building798.2.2.1.4Electrical Site Distribution Upgrade: Phase protection for main power coming in at Building 538, point of entry to campus 12,460V mainpower. Scope of workincludesprovidingphaseprotectiononall3linesgoingintoBuilding538 to serve the entirecampus.2.2.1.5Roof Assessment to be provided by the A/E for the following Buildings: 501, 540, 552, 554, 555, 633, 634, 635, 637, and 638. Total area of these roofs is approximately 170,400 sq. ft. At completion of roof assessments, HHSC, the CMR and the design team shall determine which roofs are to be repaired or replaced within the Guaranteed Maximum Price / Not to Exceed Construction Costs. That scope will be included in the overall Construction Documents as part of the Basic Services Fee.