Specifications include, but are not limited to: The scope of work for this project includes: furnishing and installing (except as noted) all materials labor and equipment necessary to reconstruct or rehabilitate selected sidewalks as listed, including: utility cover adjustments: water gate box lowering and raising, tack coat, paving; driveway preparation and lawn and driveway restoration; pavement removal, common excavation, aggregate base gravel, traffic control and cleanup. The work for the HOWARD AND SHAWMUT STREET SIDEWALK RECONSTRUCTION shall consist of, but not be limited to, the complete and satisfactory construction of approximately five thousand three hundred (5,300) linear feet of bituminous sidewalk with new granite curb, one thousand three hundred (1,300) square yards of driveway preparation, and all other incidental work as necessary to satisfactorily complete the project as outlined or implied in the Plans/Specifications.