Specifications include, but are not limited to: 1.Contractor mustprovide all labor, materials and any needed rental equipment to remove and dispose of the existing roof top units and existing roof curb adapters. The existing units are listed below: Ruud Model UJKA-A060CL Serial #5581F059712390Rooftop Package Unit (RTU) 2.Contractor mustprovide and install:(1) Oneroof top5 tonheat pumppackage unit as indicated in attached specification(1) One new roof curbadapter(1)Onedigital programmable thermostatHeat StripDisconnect switchesWhipsHardwareCondensate pipingAny other miscellaneous materials needed for a fully functional system–see specification 3.The power for this project is 208V 3 phase.The contractor mustreplace the existing 3 phase disconnectand whips to theunit. The contractor is to verify all conduit mustbe of sufficient size to comply with National Electric Code (NEC) standard for the size wire needed to comply with the Minimum Circuit Ampacity (MCA) of the new unitsTheconduit whip from the disconnect to the units mustbe sealtite flexible conduit or equal. It mustbe installed with the appropriate sealtite(or equal)fittings. The contractor mustbe responsible for all of the line voltage electrical wiring from the distribution panel to the disconnect switch and to the unit; including any needed breakers. Low voltage control wiring mustalso be the contractor’s responsibility. A new control conduit mustbe installed from the unit control cabinet to an appropriate location inside the building. Allsealtite conduit mustbe installed with the appropriate sealtite fittings. All conduit to be supported in accordance with the NEC.