Specifications include, but are not limited to: The Department will develop the environmental study with the support of a statewide on-call environmental services consultant. Environmental services specific to the project to be completed by the selected consultant will include the development of a wetland permit application package including associated wetland plans and other resource delineation as necessary. There are no requirements for a Noise Analysis or Air Quality Analysis. The consultant is responsible for a Hazardous Waste Assessment for PFAS and LRS. Preparation of Soil and Groundwater management plans are anticipated. The consultant should be prepared to submit an Erosion Control plan and MS4 Compliance documentation. At this time the Department project must comply with Alteration of Terrain rules, while a permit is not necessary. The consultant will be responsible for oversight for this compliance.