Specifications include, but are not limited to: The Town performed provided significant renovations to the Town Office in 2019, and the following work has already been completed: • Construction of the shaftway • Blocking on the rail wall • All site prep work • Pit • Preliminary electrical, telecom and heat sensor wiring • Construction of the mechanical room Work will be overseen by the Town’s architect – meetings will include a construction kick off, progress check-ins and close out. Per USDA RD rules, full payment to the selected company will be made at the completion of the project following a satisfactory inspection by the Town’s architect and Land Use Officer. The following work will be completed by the Town prior to or during the LULA installation: • Demolition of walls for LULA doorway • Drywall and any site finish work • Final electrical, telecom and heat sensor connections • Painting Architectural drawings of the Town Office and LULA shaft can be found on the Town website at https://www.townofbristolnh.org/home/pages/bids-rfps. LULA specifications include, but are not limited to: • 42x54 cab size • 1,400 pound capacity • 2 stops • Same side exit/enter configuration • 1 year minimum labor warranty