Specifications include, but are not limited to: The Contractor will provide the following services: • Clear and remove all overgrown vegetation that is within 5 feet of fence line. • Remove all existing fence around the perimeter of the facility. Dispose existing fencing and fence materials off-site. • Furnish and install new 7’ high PP plus barbed/razor wire material according to the specification listed below. • Furnish and install new entry/exit doors to match height of fence. • Install new line posts every 6 feet on center - 2 7/8” Schedule 40 set in 12x48 footing. • Install privacy slats in new chain link fence for privacy. • Top and mid rail - 1 5/8” Schedule 40. • Bottom tension wire 9 gauge smooth. • Install three strands of barbed wire and finish with razor wire. • Maintain a safe working environment to prevent injuries to CHP personnel or damage to CHP property. • At no expense to the State of California, will repair any damage caused by the Contractor or any of his/her workers. • Must field verify any and all measurements encompassed in this project and is solely responsible for their accuracy. • Ensure that the back-parking lot is secured at the end of each construction day to prevent intruders from entering the facility grounds. • Will keep the work site clean and haul away any work site debris. All removed material must be recycled where possible. • Warranty all parts and workmanship for a period of one (1) year. Contractor to supply the manufacturer’s warranties and manuals for any parts used in this project.