Specifications include, but are not limited to: improvements consist of furnishing all labor and materials for the replacement of the existing superstructure in-kind. The superstructure replacement includes, prestressed beams, beam bearing pads, concrete barriers, sidewalks, and the asphalt riding surface. The proposed width and layout of the bridge and roadway will remain approximately the same as the existing conditions after construction is complete. Additional rehabilitation work will be performed on the substructure of the bridge (which includes the concrete abutments and pier) to seal cracks, repair spalls, and clean, parge and paint the existing concrete surfaces. Minor reconstruction of the approach roadway will also be performed in order to create a smooth transition. Work will be performed under a full road closure with a posted detour for vehicles and pedestrians.