Specifications include, but are not limited to: 1.The Contractor shall take precautions to protect MSU personnel and students in the area.a)Cordon off work areas.b)Keep trip hazards (materials, cords, tools, etc.) out of walk paths.c)Promptly clean up slip hazards (spills). d)Prevent hazardous fumes from entering the building’s HVAC system and/or adjacent areas. e)etc.2.The Contractor shall be take precautions to protect MSU property. a)Protect wall, floors, doors, etc. as necessary to prevent damage from contractor activities.b)Contain dust to work area and protect walls, ceilings, furniture, drapery, window blinds, equipment, elevated horizontal surfaces, and any other items that cannot be easily and effectively cleaned.c)etc.3.The Contractor is responsible for the removal off all construction related debris, including old flooring. MSU dumpsters shall NOT be used.4.The Contractor shall broom sweep or vacuum adjacent areas each evening if they are dirtied by construction work. 5.The Contractor shall keep project materials in the immediate work area or an agreed upon staging area.6.The Contractor is to provide an accurate schedule with work dates for each room. MSU willremove and replace furniture per this schedule. (The schedule is required because MSU maynot be able to relocate the contents of all the rooms at the same time.)7.Existing wall base is to be removed in such a manner as to minimize damage to the wall texture. Damage is to be repaired so that the walls are paint ready at the completion of the work. (Painting by MSU.)8.Products are to be installed per the manufacturer’s specifications.9.Substrate is to be prepared so it complies with the manufacturer’s requirements. 10.Mechanical methods shall be used to remove substrate substances (coatings, silicone, wax, oil) that are incompatible with adhesives. Do not use solvents.