Specifications include, but are not limited to: • Septic pumping will be done on an “AS NEEDED” basis; visitor usage will determine the actual number of visits needed to be made by the contractor; • No pumping will be done on holidays or weekends unless an emergency arises; • Contractor must have a pump truck with a minimum capacity of 17,000 gallons. Allowing the ability to pump on one run saving time and expense; • Response time for the pumping must be no more than seven (7) days after notification; • All trash must be removed from the vaults and properly disposed of, off site by the contractor; • The solids and liquid level must be pumped out as low as possible so that no more than 4 inches or less of liquid remains in each vault or septic. This may require the contractor to back flush the vaults, so all solids are removed; • The contractor shall keep the outside premises free of debris and accumulation of waste. Any spillage must be properly cleaned up by the contractor prior to leaving the site.