Loading...
Skip to main content

Indiana

(264 results)
264 results
Countywide Bridge Inspection and Inventory Program Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443653660314
APM Residence Remodel at Brown County SP Indiana 21 day(s) left Published 09/08/2025 Closing 10/28/2025 443653605883
Contractor pricing for services offered per hour, mobilization and any other charges for any or all of the following but not limited to: ditching, trenching, tree removal, culverts and trucking. Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709874
Ready-mix concrete- Class A, B and C, to meet INDOT Standard Specification, Section 702. 1,500 cubic yards or less. Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709872
Bridge can be concrete or steel. All steel bridge materials must be designed in accordance with current HS20-44 loading and be designed by a professional engineer registered in the state of Indiana Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709871
Four Thousand (4,000) feet more or less of pipe from 15 inches to 96 inches in diameter, and Five Hundred (500) feet more or less of structural plate and arch pipe in all sizes, delivered to job site. Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709870
Eighty Thousand (80,000) gallons more or less of AEP Prime delivered by transport loads. Two Hundred Thousand ( Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709869
Liquid Bituminous Material and Two Thousand Two Hundred (2,200) tons more or less of Bituminous Concrete Mixtures. Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709868
Ten Thousand (10,000) tons more or less, washed clean gravel or crushed and graded gravel as ordered by the Commissioners. F.O.B. quarry or yard. Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709867
Forty Thousand (40,000) tons more or less of Class A crushed limestone rock or equivalent as ordered by the Commissioners. F.O.B. quarry, yard or delivered to the Spencer County Highway Department yard Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709865
Thirty-four Thousand (34,000) gallons more or less of regular unleaded gasoline, (to be not less than 87 Octane) and Twenty-two Thousand Five Hundred (22,500) gallons more or less of High Sulfur (off-road Indiana 1 day(s) left Published 09/08/2025 Closing 10/07/2025 443652709864
Security and Camera Improvements Indiana 1 day(s) left Published 09/05/2025 Closing 10/07/2025 443652280635
LOGISTICS Indiana 1 day(s) left Published 09/05/2025 Closing 10/08/2025 443652020682
WILCOX G24 LITE HELMET MOUNTS Indiana 1 day(s) left Published 09/05/2025 Closing 10/08/2025 443652020681
FILTERS Indiana 1 day(s) left Published 09/05/2025 Closing 10/08/2025 443652020680
All Payer Claims Database Indiana 38 day(s) left Published 09/04/2025 Closing 11/14/2025 443650064892
Debt Collection Services Indiana 10 day(s) left Published 09/04/2025 Closing 10/17/2025 443650064887
Noble County Riley Road Intersection Improvements Indiana 4 day(s) left Published 09/03/2025 Closing 10/10/2025 443648006014
Six Thousand (6,000) More or Less Universal/Nestable Refuse and Yard Waste Containers Indiana 49 day(s) left Published 09/03/2025 Closing 11/25/2025 443647038484
Cigarette Tax Stamp Vendor Indiana 23 day(s) left Published 09/03/2025 Closing 10/29/2025 443647038457
Janitorial services for Elkhart WorkOne office Indiana 4 day(s) left Published 09/02/2025 Closing 10/10/2025 443644866549
Abraham Lincoln Elementary School Parking Lot Resurface Indiana Not Stated Published 08/29/2025 Closing Not Available 443647038476
Shelby Street Housing Hub - Building Demolition Package Indiana Not Stated Published 08/29/2025 Closing Not Available 443647038473
INTENT TO SELL REAL PROPERTY Indiana Not Stated Published 08/29/2025 Closing Not Available 443647038463
Curbside recycling and collection services Indiana 16 day(s) left Published 08/29/2025 Closing 10/22/2025 443641586712

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 11