Loading...
Skip to main content

Illinois

(613 results)
613 results
Material Deliver and Install Proposal for Roadway Modification and Bituminous Surface Treatment. Illinois 6 day(s) left Published 06/13/2025 Closing 06/26/2025 443549217066
Construct hot-mix asphalt resurfacing with aggregate wedge shoulders Illinois 6 day(s) left Published 06/13/2025 Closing 06/26/2025 443549217063
Street maintenance - heat scarification Illinois 4 day(s) left Published 06/13/2025 Closing 06/24/2025 443549217056
SEAL COAT Illinois 4 day(s) left Published 06/13/2025 Closing 06/24/2025 443549217061
2025 AMERICAN LANE AND PLAZA DRIVE IMPROVEMENTS CONSISTS OF PCC SIDEWALK (2,716 SF) Illinois 7 day(s) left Published 06/13/2025 Closing 06/27/2025 443549127388
Surface and full depth patching at various locations within the City of Lockport. Illinois 11 day(s) left Published 06/13/2025 Closing 07/01/2025 443549127387
Striping various streets within the City of Lockport with thermoplastic pavement markings. Illinois 12 day(s) left Published 06/13/2025 Closing 07/02/2025 443549127386
Concrete Crushing Program Illinois 18 day(s) left Published 06/13/2025 Closing 07/08/2025 443549172560
Microsurfacing, 3.735 Miles Illinois 3 day(s) left Published 06/13/2025 Closing 06/23/2025 443549217064
Reconstruction of East 7th Street Illinois 7 day(s) left Published 06/13/2025 Closing 06/27/2025 443549127393
HMA MILL & OVERLAY WITH AGG BASE REPAIR Illinois 6 day(s) left Published 06/13/2025 Closing 06/26/2025 443549127384
VILLAGE OF AROMA PARK ±2025 MFT STREET MAINTENANCE PROGRAM Illinois 6 day(s) left Published 06/13/2025 Closing 06/26/2025 443549127396
This project involves earthworks, structural installations, and infrastructure development, including trench excavation. Illinois 4 day(s) left Published 06/13/2025 Closing 06/24/2025 443549217059
Street maintenance - sealcoating and fog Illinois 4 day(s) left Published 06/13/2025 Closing 06/24/2025 443549217058
Seal Coat Aggregate CA-16 (Black Trap Rock) - 190 Ton Illinois 6 day(s) left Published 06/13/2025 Closing 06/26/2025 443549217055
Twiggs Park Playground Improvements Illinois 18 day(s) left Published 06/13/2025 Closing 07/08/2025 443549127374
Full-Depth Resurfacing, Hot-Mix Asphalt Surface Removal Illinois 6 day(s) left Published 06/13/2025 Closing 06/26/2025 443549127385
THE PROPOSED PROJECT WILL INCLUDE MILLING AND BITUMINOUS SURFACE PLANT MIX (SPECIAL) OVERLAY OF VARIOUS STREETS IN THE CITY OF CHILLICOTHE, IL Illinois 5 day(s) left Published 06/13/2025 Closing 06/25/2025 443549217051
Milling and resurfacing Illinois 5 day(s) left Published 06/13/2025 Closing 06/25/2025 443549217052
Material Delivery of Seal Coat Bituminous Materials Illinois 5 day(s) left Published 06/13/2025 Closing 06/25/2025 443549217054
Street maintenance - seal coating and fog coating Illinois 4 day(s) left Published 06/13/2025 Closing 06/24/2025 443549217053
INSTALLATION OF TWO DOUBLE BARREL Illinois 6 day(s) left Published 06/13/2025 Closing 06/26/2025 443549127397
PAVEMENT RESURFACING INCLUDING 8343 SY HMA SURFACE REMOVAL Illinois 4 day(s) left Published 06/13/2025 Closing 06/24/2025 443549127399
AI (Artificial Intelligence) Driven Campus Experience Illinois 18 day(s) left Published 06/13/2025 Closing 07/08/2025 443549088349
CONST. HMA RESURF., INCL. 1,055 TON HMA SC, IL-9.5, C, N50, 100 S.Y. BIT. SURF. REM., BUTT JT., 5,220 LB. BIT. MATL'S. (TACK CT.) & 163 TON AGG. SHLD., TY. B (0.99 MI.) Illinois 4 day(s) left Published 06/13/2025 Closing 06/24/2025 443549127395

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 25