Loading...
Skip to main content

Illinois

(922 results)
922 results
Crack and joint sealing on I-57 from south of the north I-64 tri-level interchange to the Marion County line. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785863410
(1,375-Ft) Standard Overlay, ADA Improvements Project with HMA surface and binder course, thermoplastic pavement markings, curb ramps located on Kimball Avenue from Diversey Avenue to Wellington Avenue Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785783338
19.3 miles, ultra-thin bonded wearing course, microsurfacing joint repairs, pavement patching, and rest_area improvements from LaSalle County Line_to Ogle County Line. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803194
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-90/94 (Dan Ryan Expwy Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803193
Rehabilitate T-Hangar Pavements Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803189
Traffic signal improvements at various locations in Moline. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803192
Construct a 10'x 10' triple barrel reinforced concrete box culvert to carry CH 22 over Toms Creek, 0.5 miles north of Alexis. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785783322
Bridge washing at eight major river crossings within District 6. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785863405
1.4 miles of tree removal for the new Illinois River Bridge in Florence. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803188
12.4 miles of patching, milling, and resurfacing on Osco Rd from IL 81 to US 6. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803190
75.3 miles of Litter removal along interstate right-of-ways in Champaign County. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803187
Districtwide tree removal on an on call basis. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803186
Traffic signals improvements at various locations on Kimball Street between Grove Avenue to Dundee Avenue in Elgin. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803182
0.6 miles of HMA removal, pavement overlay, patching and shoulder work on Old US 51 from IL 146 to US 51. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785863401
Application of growth regulator and broadleaf herbicide chemicals to vegetation within the "Safety Zone" along_shoulders of District 3 Interstate Routes and ramps, including I-80, I-180, I-55, I-39, and Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803181
Construct a four-span steel beam structure with concrete deck to carry Grapevine Trail over clear Creek, 1/2 miles east of McClure. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803184
Cleaning and painting steel bridge, pavement striping, and traffic control at SN 019-0012 carrying IL Route 64 over S. Branch Kishwaukee River in Dekalb County. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803177
650 ft of standard overlay at US BUS 20 and Logan Ave. South to 2nd St. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803172
Resurfacing Mittel Drive from Thorndale Avenue to Devon Avenue in Wood Dale. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803175
(480-Ft) The work consists of the construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconstruction, erosion control and protection, utility relocation of Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803174
Replace Runway and Taxiway Guidance Signs Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803173
Culvert replacement at ditch 0.4 mile south of US 136 in Heyworth. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785736131
Bridge repairs and joint replacement on SN 052-0068, carrying IL 251 over Bureau Creek, 0.80 miles north of Lee County line. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803158
Removing existing dual CMP culverts at three locations and replacement with a precast concrete box culvert, ditch cleaning, pavement removal and replacement, landscaping and other related construction Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785803152
0.6 miles of pavement, shoulder and median replacement on IL 1 at the I-64 interchange. Illinois 2 day(s) left Published 12/10/2025 Closing 01/16/2026 443785736126

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 37