Loading...
Skip to main content

Illinois

(902 results)
902 results
IEPA SRF Census Tract 2 – Block Level Lead Service Line Replacements (LSLR) Illinois 13 day(s) left Published 12/12/2025 Closing 01/26/2026 443787127690
IEPA SRF Census Tract 1 – Block Level Lead Service Line Replacements (LSLR) Illinois 13 day(s) left Published 12/12/2025 Closing 01/26/2026 443787127688
IEPA SRF Census Tract 7 – Block Level Lead Service Line Replacements (LSLR) Illinois 13 day(s) left Published 12/12/2025 Closing 01/26/2026 443787127697
IEPA SRF Census Tract 4 – Block Level Lead Service Line Replacements (LSLR) Illinois 13 day(s) left Published 12/12/2025 Closing 01/26/2026 443787127695
2026 Grounds Fertilization and Herbicide Application Illinois 9 day(s) left Published 12/12/2025 Closing 01/22/2026 443787207357
Remote Proctoring System Solution Illinois 7 day(s) left Published 12/11/2025 Closing 01/20/2026 443786817328
PEORIA COUNTY JAIL – KITCHEN PHASE 1 IMPROVEMENTS Illinois 1 day(s) left Published 12/11/2025 Closing 01/14/2026 8023164463
Demolish and Construct Building Illinois 14 day(s) left Published 12/11/2025 Closing 01/27/2026 443786711880
Resurfacing 5th Avenue from Harrison Street to Quincy Street in Maywood Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443786855984
Hyperconverged Infrastructure Refresh Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443787207358
Self-Contained Special Education ELA Curriculum Pilot Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443787207360
5.8 miles of milling and resurfacing 3 3/4" (designed overlay) for IL 29/26 and milling 3 1/2", resurfacing 3 3/4" (designed overlay) for SBI 29; additional work includes ditch cleaning, pipe culvert replacement Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443786689967
Evergreen Avenue Box Culvert Illinois 4 hour(s) left Published 12/11/2025 Closing 01/13/2026 443786725988
2026 Roof Replacement at Antioch Upper Grade School Illinois 8 day(s) left Published 12/11/2025 Closing 01/21/2026 443786600202
Airport Fuel Tank Removal Illinois 1 day(s) left Published 12/11/2025 Closing 01/14/2026 443786523557
National Bridge Inspection Program Manager FY26/27 to 28/29 Illinois 1 day(s) left Published 12/11/2025 Closing 01/14/2026 443786473383
Litter Picking project shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-55 - Stevenson Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785906279
Bridge washing of 8 structures over the Rock River in various Counties. Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785906280
Patching on I-55 from the Montgomery County line to the Logan County line, I-72 from the Morgan County line to the Macon County line and IL 29 from Dirksen Parkway in Springfield to 0.2 miles east of Cardinal Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785897526
Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish which has accumulated on the highway areas. This Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785906278
ADA Improvements: curb ramps for sidewalks (ADA) including combination curb and gutter removal and replacement, sidewalk removal and replacement, installation of detectable warning surfaces, drainage structure Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785897525
Roadway widening and HMA resurfacing of Waukegan Road and Westleigh Road in Lake Forest. Includes traffic signal modernization, lighting, curb and gutter, sidewalks, and storm sewer. Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785906277
(767.78-Ft) Designed Overlay Project Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785906276
Bridge washing of 5 structures over the Rock River in Henry and Rock Island Counties. Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785906275
(780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, Illinois 3 day(s) left Published 12/11/2025 Closing 01/16/2026 443785897518

Your search returned no results.

suggestions:

  • Make sure that all words are spelled correctly.
  • Try different words that mean the same thing.
  • Try more generic terms.

of 37