Specifications include, but are not limited to: Work included under this project at Shippensburg University, Shippensburg Township, Cumberland County, Pennsylvania consists of the construction of a new locker room building at the Seth Grove Stadium with masonry foundation and walls, metal siding, with locker room fit out, including all new HVAC, Plumbing and Electrical, with tie in to the existing building and systems as required including site improvements and utility relocation. The includes construction of a connector with the existing building consisting of a prefabricated noncombustible structure to be placed on concrete foundations and the selective demolition required to provide a new access point including relocation of existing utilities, lighting and door replacement. Work shall be accomplished by four prime contractors, and shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General, HVAC, Plumbing and Electrical construction identified on the Contract Documents