Specifications include, but are not limited to: BRIDGE REPLACEMENT - WATER AND SANITARY SEWER RELOCATION: Project Generally comprises removal/abandonment of existing water main and certain existing water main items, construction of approximately 850 LF of 8” DICL water main, including a stream crossing and a water main section installed by boring, installation of (2) fire hydrants and replacement of (3) service laterals; removal of (1) manhole and section of existing sanitary sewer main, construction of approximately 710 LF of 8” PVC sanitary sewer main, including a stream crossing installed by boring and installation of (4) manholes; approximately 3600 SY of mill and overlay; and restoration to areas disturbed by construction operations.