This project generally consists of but is not limited to, replacing the existing wet/dry well pump station with a precast submersible pump station including new wet well and valve vault. Additional work includes, but is not limited to, installation of a new force main to connect to the existing force main at the road, new natural gas service for emergency generator, water service line with yard hydrant, installation of new influent gravity sewer, natural gas generator (generator and ATS to be procured and provided by the Owner), site improvements and chain link fencing. Also included in the scope of work is the demolition of the existing interior components of the pump station building including removal of electrical and mechanical equipment, concrete demolition, and filling the subgrade wet/drywell with stone and capping with concrete. The proposed electrical/mechanical equipment and pump controls will be housed in the existing building.