Specifications include, but are not limited to: 1. Administrative and managerial procedures included in Division 0 and 1. 2. Temporary protection, temporary services, and temporary facilities. 3. Protection and securing of the building envelope including sealing of exterior openings to make building weather-tight; and physical building security elements. Administration building shall be water-tight and secure at the end of each day’s work. 4. Contractor shall provide temporary heating and/or cooling to maintain safe and acceptable working temperatures for the Work as required for their work for the duration of the Project. 5. Install access doors and panels, anchors, embedment’s, bolts, plates, sleeves, boxes, etc. furnished under other Contracts. 6. Provide blocking, backing, box-outs, recesses, etc. required for the Work of other Contracts.