This project includes but is not limited to the following: mobilization and demobilization; mechanical cleaning, standard cleaning, root and grease removal, mineral deposit removal, spot repair removal as required, televising and inspecting of sewer mains and laterals, lining sanitary sewer pipe (mains and laterals) with a cured in place pipe (C.I.P.P.) liner, installation of hydrophilic gaskets, bypass pumping, joint grouting as required, installation of new sanitary sewer cleanouts, installation of full diameter lateral to main connection liners (one-piece main and lateral C.I.P.P. lining), traffic control, lateral re-instatement and grouting, restoration of all disturbed areas and coordination with the Authority, Township and residents as specified herein. Lateral lining shall be from the main to the right of way. Excavation will be required for lateral cleanout installation.