Specifications include, but are not limited to: Full Building Demolition of Maple Hall, Laurel Manor, and Pinecrest Manor including selective demolition of existing site construction. Site grading, site restoration and improvements of existing building area, and surrounding site. Removal and capping of existing site utilities serving the buildings to be demolished such as but not limited to domestic water, sanitary sewer, storm sewer, steam, gas, electric, and technology cabling. Site storm sewer, site electric and site technology work. Construction of a new storage building. Demolition of existing site improvements, site grading, site improvements, concrete foundations, concrete slab on grade, pre-engineered metal building, electrical power and distribution, lighting, heating, plumbing, fire protection.