Specifications include, but are not limited to: The Contract involves replacing the existing culvert with a corrugated metal arch pipe. 1. Perform all earth-moving activities in compliance with the Sedimentation and Erosion Control Plan furnished by the ENGINEER prior to construction. 2. Reduce by the maximum extent practicable, the area and duration of exposing readily erodible soils. 3. Protect the soil by use of temporary vegetation, or seeding and mulch, or by acceleration the establishment of permanent vegetation. Complete and protect segments of work as rapidly as is consistent with construction schedules. 4. Retard the rate of runoff from the construction site and control the disposal of runoff. 5. Trap sediment resulting from construction in temporary or permanent silt holding basins. This includes pumps discharges resulting from the dewatering operations. 6. Sprinkling or applying dust suppressors to keep dust within tolerable limits on haul roads and at the site. 7. Use temporary bridges or culverts where fording streams is objectionable. Borrow areas should be located where pollution from operation can be minimized. Location should be avoided where pollution would be inevitable. 8. Should construction operations be suspended for any appreciable length of time, temporary measures for the control of erosion must be utilized. 9. Provisions shall be made for protection against discharge of pollutants such as chemicals, fuels, lubricants, sewage, etc., into the stream.