Specifications include, but are not limited to: The project includes providing all equipment and labor for the transportation and placement of approximately 12,750 SY of 9.5 mm Superpave asphalt wearing course overlay (2†depth), 4,575 SY of 25 mm Superpave asphalt base course (4†depth), approximately 1,275 tons of scratch coat using 9.5 mm Superpave asphalt material, approximately 2,875 SY of asphalt milling (0 to 4†depth), approximately 450 SY of subgrade repairs, approximately 350 LF of 4†Pavement Base Drain, approximately 1150 LF of Pavement Mill Notch, and the installation of 2 inlets, 1 endwall, 61 LF of 18†RCP and 67 LF of 24†RCP. All of the 9.5 mm Superpave asphalt material and the 25 mm Superpave asphalt material required for this project will be purchased directly by the Township. The Contractor must supply all other equipment, labor, material, etc. necessary to complete this project.