Specifications include, but are not limited to: AT MAIN OFFICE: (1) PROVIDE AND INSTALL (1) 120/240 VOLT AIR COOLED 22KW SINGLE PHASE PROPANE FIRED GENERAC AUTOMATIC GENERATOR. PROVIDE COLD WEATHER KIT. (2) PROVIDE AND INSTALL (1) 200 AMP MAIN BREAKER SERVICE ENTRANCE RATED TRANSFER SWITCH. (3) INSTALL (1) 3'+5' 4" THICK CONCRETE PAD FOR GENERATOR. (4) PROVIDE ALL FEEDERS AND CONTROLS FROM GENERATOR TO TRANSFER SWITCH. (5) PROVIDE BATTERY, START UP AND WARRANTY PAPERWORK FOR NEW MACHINE. (6) SET EXERCISER WITH OWNER FOR PROPER TIME. (7) DISCONNECT EXISTING GENERATOR POWER, CONTROLS AND GAS. REMOVE EXISTING TRANSFER SWITCH IN BASEMENT AND RETURN TO COMMUNITY. COMMUNITY PERSONNEL TO REMOVE AND DISPOSE OF EXISTING GENERATOR. (8) PROVIDE TOWNSHIP ELECTRICAL PLAN REVIEW, PERMIT AND COORDINATE INSPECTIONS. ***NOTE: ALL GAS PIPING, GAS CONNECTIONS BY BOTINI ENERGY. CONTRACTOR TO WORK IN COORDINATION WITH GAS COMPANY. AT CLUB HOUSE: (1) PROVIDE AND INSTALL (2) 120/240 VOLT AIR COOLED 22KW SINGLE PHASE PROPANE FIRED GENERAC AUTOMATIC GENERATORS. PROVIDE (2) COLD WEATHER KITS. (2) PROVIDE AND INSTALL (2) 200 AMP MAIN BREAKER SERVICE ENTRANCE RATED TRANSFER SWITCHES ON OUTSIDE OF BUILDING. (3) INSTALL (2) 3'+5' 4" THICK CONCRETE PADS FOR GENERATORS APPROX 25' BEHIND BUILDING. EXACT LOCATION TO BE CONFIRMED WITH COMMUNITY PERSONNEL. (4) PROVIDE ALL FEEDERS AND CONTROLS FROM GENERATORS TO TRANSFER SWITCHES. (5) SEPARATE GROUND AND NEUTRAL CONDUCTORS IN (2) PANELS. (6) PROVIDE BATTERY, START UP AND WARRANTY PAPERWORK FOR NEW MACHINE. (7) SET EXERCISER WITH OWNER FOR PROPER TIME. (8) PROVIDE TOWNSHIP ELECTRICAL PLAN REVIEW, PERMIT AND COORDINATE INSPECTIONS.