Specifications include, but are not limited to:. This project is situated as follows, From approximately 0.4 miles east of the intersection with SR 0008 at Segment 0294 Offset 0350 (Station 978+00.00) then east to approximately 1.1 miles west of the intersection with SR. 2024 at Segment 0290 Offset 2248 (Station 983+41.00). For rehabilitation of bridge deck over Tributary to Hubbel Run, having an overall length of 20'-10 7/8", includes removal of portion of existing structure, bituminous approaches with Warm Mix Asphalt Designs, milling of concrete slab, concrete repairs, waterproofing, minor drainage and guiderail improvements, paved shoulders, and pavement markings all within a project length of 341.00 feet (0.065 mile) as indicated on the approved drawings.