Specifications include, but are not limited to: First Floor Restroom renovation, including family restroom. Demolition: Demolish floor tile and walls/doors per plans. Walls: Existing Plaster/Brick/New gypsum wall board Painted. Other: Flush doors in hollow metal frames. Room Name: Women 101, Men 102 and Family Toilet 134. Demolition: Demolish floor tile and walls/doors per plans. Flooring: Quartz tile. Walls: New gypsum wall board with paint, 5-foot-high wainscot tile with accent band. Counters: Quartz with backsplash. Wall base: tile. Ceilings: Gypsum ceiling board. Lighting: LED cans. Audio Visual: Speakers for sound system; provide data, cable, voice feeds to a termination box (2 per room) for future AV equipment. Fixtures. Structural: New steel lintel at masonry openings and structural steel support for HVAC unit.