Specifications include, but are not limited to: network of gravity collection sewer and manholes, two (2) new duplex pump stations, and conveyance force mains. The Old Masters Pump Station No 4 Service Area contains one new duplex pump station (600 GPM Each) and approximately 4,750 L.F. of 6” C900 or equivalent force main and appurtenances, 22,250 L.F. 8” P.V.C and 5,550 L.F. of 10” P.V.C. gravity sewer mains, 2,450 L.F. 8” D.I. gravity sewer mains, 140 pre-cast concrete manholes with frame and covers, 175 lateral connections, and state highway, local highway and off-street restorations. The Camelot Lane Pump Station No. 6 Service Area contains one new duplex pump station (1,350 GPM Each) and approximately 250 L.F. of 8” C900 or equivalent force main and appurtenances, 1,000 L.F. 8” P.V.C., 5,500 L.F. of 10” P.V.C. and 250 L.F. of 12” P.V.C. gravity sewer mains, 130 pre-cast concrete manholes with frame and covers, 25 lateral connections, and local highway, state highway and off-street restorations.