Specifications include, but are not limited to: The construction of a 6,600 square foot pre-engineered vehicle storage and office building. The project includes but not limited to the excavation, complete construction of the new building, installation of stormwater infrastructure, installation of site utilities, asphalt paving, site restoration, and all materials, labor and equipment necessary for a complete project. The bids must cover all costs for the completion of this project as set forth in the Project Manual. The project will be bid with the following contracts representing the work to be performed: 1) General Building Construction; 2) Electrical Construction; 3) Plumbing Construction; and 4) HVAC Construction.