Specifications include, but are not limited to: •The estimated square footage for all spaces to be abated are listed below, although contractors should field verify allamounts for their quote: •First Floor / Basement •1050 square feet - First Floor •1350 square feet (basement) •35 fire doors •boiler packing •60 pipe fittings•In addition, we need to remediate the lead containing material present in the former firing range area (Room 008). Andrefer to Addendum Report that also shows ACM was detected in pipe fittings, ceiling and wall tile with holes. •600 square feet •15 pipe fittings•Work is to be completed in the vacant side of an active Fire Station. Precautions must be made to ensure the safety ofFirefighters and ease of access/egress of Fire apparatus at all times.•There is network equipment on site that CANNOT be moved or disconnected, and must be protected. Precautionsmust be made to ensure no damage will occur to any equipment. Loose items and materials will be removed by CITYprior to abatement except as noted above or in walk through; however, contractor will be responsible to move or demoany fixed materials needed to complete abatement. •Abatement contractor will be responsible for providing any and all ancillary equipment or materials, such asdumpsters, for the successful completion of the work.