Specifications include, but are not limited to: 1 LUMP SUM - Mobilization and Demobilization, Complete 1 2 LUMP SUM - Maintenance and Protection of Traffic, Complete 1 3 SQUARE YARDS - Full Width Milling of Exist. Bit. Conc. Pavement Structure, 3 ½” Depth, Complete 3140 4 SQUARE YARDS - Bit. Conc. Base Course Replacement, Including Subbase, Superpave Asphalt Mixture Design, HMA Base Course, PG 64-22, 0.0 to 0.3 Million ESAL’s 25.0 mm Mix, 4” Compacted Depth, Where Directed, Complete in Place 470 5 CUBIC YARDS – Over-excavation, When Authorized and Where Directed, Complete in Place 10 6 SQUARE YARDS – Full Width Bit. Conc. Structural Overlay, Superpave Asphalt Mixture Design, HMA Binder Course, PG 64-22, 0.0 to 0.3 Million ESAL’s 19.0 mm Mix, 2”