Specifications include, but are not limited to: The Weatherly Multi-Use Trail Phase I project in Weatherly Borough is a 0.66 mile linear trail project in a corridor owned by the Borough of Weatherly. The multi-use trail will be a 10 foot wide trail with 2 foot graded shoulders. The project will, for the most part, use the existing drainage infrastructure and rehabilitate the existing ditches associated with the trail corridor. Some new drainage pipes are proposed. Drainage areas, flow patterns, volumes and drainage structures / location of drainage structures are proposed to remain unchanged by the trail implementation. The ground disturbance associated with this Multi-Use Trail project will primarily be: 1) the excavation of the trail corridor; 2) removal of soil and debris in the trail drainage pipes and ditches to re-establish functionality; and 3) construction of two pedestrian bridges. Suitable excavated material / soil will be reused within the trail corridor as fill and base material. All unsuitable material / soil will be properly disposed of off-site. Required signage and access control features (gates, boulders, fencing) are also to be installed.