a) Demo and remove existing wall tile or current surround and caulking b) Remove any damaged drywall behind area of new surround c) If needed, install studs around wall to attach surround d) Install blue board or wonder board on walls e) Install sectional tub surround f) Patch, repair, and paint damaged walls around new surround g) Re-caulk entire perimeter of bathtub and as needed h) Paint touch-up, as needed, with mold and mildew resistant paint i) Re-install plumbing fixtures and grab bars; install new items as needed j) Any/All materials are to be removed by contractor and areas should be left clean of dust, materials, and debris k) Work area to be left in a clean and safe condition l) No debris to be placed in Authority trash receptacles m) All work will be scheduled by a Senior Project Manager in Facility Services n) Scheduled work must be completed in three (3) days o) Work to be completed during regular business hours 8:00 AM – 4:30 PM p) Residents will be properly notified of the schedule, access and installation q) Contractor will not move any furniture or belongings r) Contractor will provide MSDS and adhere to recommendations and proper use of products s) Contractor is responsible for obtaining any required permits t) Contractor will have resources to complete the project within a 15-day period of call to schedule work. u) Authority will provide some materials. Contractor must obtain materials from Authority stock first. All materials furnished by the Contractor, for use in this contract, must be approved by Authority