a) Mobilization to the site and staging. b) Material purchase and installation of temporary erosion and sediment control measures per the approved Erosion and Sediment Control Plan. c) Demolition and site preparation for proposed project items; including land clearing and rough grading, per the plan drawings and specifications. d) Material purchase and installation of the Basketball Hoops, per the plan drawings and specifications. e) Material purchase and installation of concrete bench pads, per the plan drawings and specifications. f) Material purchase and installation of the basketball courts, per the plan drawings and specifications. This includes all acrylic paint lines, as shown in the plan drawings and specifications. g) Coordination with Canton Borough to receive, assemble, and install the Borough purchased benches, per the plan drawings and specifications. h) Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area. i) The removal of all construction materials; including all temporary erosion and sediment control BMPs.