The description and location of the project is as follows: For the construction of a certain section of STATE HIGHWAY in CAMERON COUNTY, GIBSON TOWNSHIP, Commonwealth of Pennsylvania, STATE ROUTE 0555, SECTION 409.This project being situated as follows - On SR 0555 starting at Segment 0100 Offset 0166 and continuing to Segment 0100 Offset 1261 for a construction length of approximately 774 feet (0.15 miles).To provide corrective measures to repair erosive damage. Construction includes Soldier Pile Retaining Walls, superpave asphalt mixture designs for the base, binder, and wearing courses, guide rail, pavement markers, temporary traffic signals and miscellaneous construction as shown on the approved construction drawings.