The Work comprises the demolition of structure, fencing, retaining wall, private sidewalk, foundation work, rubbish, asbestos abatement as needed, utility disconnect work, installation of a new handrail, and wooden fence, property restoration and all appurtenances for a complete job in accordance with the Contract Documents. The Structure has been declared unsafe to enter to complete the asbestos testing. The Engineer’s Certified Asbestos Inspector will be onsite during the demolition process. The building materials must be kept adequately wet at all times, starting with the demolition process, through site cleanup, transport and final disposal. "Adequately wet" means sufficiently wet to prevent the release of particulates and there are no visible emissions observed from any asbestos-containing material. If visible emissions are observed, the demolition must cease, and additional wetting must be performed until no emissions are occurring. However, the absence of visible emissions is not sufficient evidence of being adequately wet. For a complete discussion of the structurally unsound and in danger of imminent collapse provisions under the Asbestos NESHAP, please refer to 40 C.F.R. §§ 61.141 and 61.145(a)(3), 61.145(c)(4) -(9). A handrail shall be installed along East Third Street up to the existing hand rail. A fence shall be installed at the rear of the property after demolition to match in kind the neighbors existing fence.