• Evaluate existing conditions and complete preliminary engineering to include surveying and sampling • Meet surface gradient standards for AAC D for fillets between Taxiway A, D and F • Remove existing sections of Portland Cement Concrete and replace with bituminous pavement • Mill/overlay existing bituminous surfaces • Add 25-foot paved shoulders to meet TDG 5 criteria • Update geometry and eliminate hot spot 1 at the intersection of Taxiway A, D and G • Install new in pavement centerline and raised edge LED lighting, components and cabling • NPDES Permitting & Erosion and sedimentation controls • Integration with SMGCS control system and existing lighting controls. • Preparation of Construction Safety Phasing Plan • Sequence work to minimize daily impacts • Establish phasing and preparing bid packages commensurate with funding