Specifications include, but are not limited to: Plumbing: Bathroom: Remove existing RH/LH tub, commode and wall hung sink Cut out existing cast iron commode flange, replace with new PVC flange (if applicable) Cut out all copper drains, waste, existing vent to remain (if applicable) Install new PVC drains, waste line, reconnect to existing vents Disconnect shut off valves, "P" traps and drains Rough in for new tub/shower, waste and overflow, diverter Install new RH/LH tub, w/new tub and shower trim-kit Install pex or copper water lines Install new commode, wax ring, valve and supply line Install new drains, valves and supply lines for 24" vanity (if applicable) Kitchen: Disconnect existing double bowl sink from supply lines and "P" traps Install supply lines, shut off valves and "P" traps to new kitchen sink, faucet, w/ crumb cups \ Basement: Remove all CPVC plumbing lines (If applicable) Cut out all copper drains, waste, existing vent to remain (if applicable) Install new PVC drains, waste line, reconnect to existing vents Install pex piping to sinks, tub, and laundry tray (If applicable) Existing shower stall to remain in 4 and 5 bedroom units only (If applicable).