The work to be covered by these Specifications consists of all labor, equipment, materials and other facilities necessary and proper to construct the Pennsville Wastewater Treatment Plant Phase 1. The Phase 1 construction of the treatment facility includes site work, piping and tanks installation, and stormwater management measures. The scope of Phase 1 does not include any mechanical equipment, structural buildings, or electrical work. The work to be completed encompasses the erosion and sedimentation controls, stormwater management facilities, site grading, landscaping, excavation, influent pump station wet well and valve vault, the influent screening chamber, the influent equalization tank, two (2) Sequencing Batch Reactor (SBR) tanks, post SBR equalization tank, yard piping, storm sewer, and gravity sanitary sewer from the Kola Road Pump Station.