Specifications include, but are not limited to: The IFB will cover Electrical Construction (.4 Contract) with the provision of a new tie-feeder switchgear for the future conversion of the existing campus radial power distribution feeders into a loop feeder system. This construction contract will include, but not limited to switch siting construction, several new power duct banks, manhole modifications, new manhole, paving/lawn restoration, power/ATC/telecom feeds to the new switchgear, tie-feeder cabling, controls, and control connections to the existing campus Siemens Building Management System for monitoring the switchgear electrical usage. All work shall take place on the Lower Campus of Bloomsburg University.