All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: The purpose of PGW’s two LNG facilities is to provide natural gas supply for firm residential, commercial, and industrial customers during the winter operating season (November through March). Both facilities are integral components and allow PGW to provide a reliable supply of natural gas and enjoy cost savings. Design, consulting, and inspection services for natural gas piping and pipelines should be in accordance with federal, state, and local codes. Ancillary services in support of the LNG Engineering Services, including but not limited to construction supervision, civil, structural, fire protection, electrical, mechanical, and instrumentation engineering. Process engineering services for design and consulting of existing and nascent technologies including but not limited to geothermal, fuel cell, and hydrogen production. Owner’s engineering and representation services when working with PGW’s third parties, including but not limited to, suppliers, manufacturers, and contractors. Construction engineering and supervision services during project implementation.