Indian Orchard River Access Development Project a) Mobilization to the site and staging. b) Material purchase and installation of temporary erosion and sediment control measures per the approved Erosion and Sediment Control Plan. c) Demolition and site preparation for proposed project items; including land clearing and rough grading, per the plan drawings and specifications. d) Material purchase and installation of the Park Sign, including concrete, stone, and rebar; per the plan drawings and specifications. e) Material purchase and installation of the River Access Sign, including concrete, stone, and rebar; per the plan drawings and specifications. f) Coordination with Wayne County to receive, assemble, and install of 42” Removable Bollards, per the plan drawings and specifications. g) Material purchase and installation of the Asphalt Drive, per the plan drawings and specifications. h) Material purchase and installation of Precast Boat Launch, per the plan drawings and specifications. i) Material purchase and installation of the Asphalt Parking Area, per the plan drawings and specifications. j) Material purchase and installation of the Boot Cleaning Station; per the plan drawings, and specifications. k) Coordination with Wayne County to receive concrete stamps for use on concrete pad, per the plan drawings and specifications. l) Material purchase and installation of the Concrete Pad(s), per the plan drawings and specifications. m) Material purchase and installation of the Placed Boulder(s), per the plan drawings and specifications. n) Material purchase and installation of the Ada Parking Sign, Paint, and Precast Vehicle Wheel Stops, per the plan drawings and specifications. o) Coordination with Wayne County to receive, assemble, and install picnic tables, and trash receptacles; per the plan drawings and specifications. p) Material purchase and installation of Split Rail Fence, including footings, stain and sealer, per the plan drawings and specifications. q) Final topsoil grading, rolling, seeding, and mulching of any remaining disturbed area. r) The removal of all construction materials; including all temporary erosion and sediment control BMPs.