Specifications include, but are not limited to: Contractor will perform snow and ice removal for SARAA, at the Harrisburg International Airport, on the following streets, Airport Drive, from the west end at gate 80 to the east end at the intersection of Ann Street. Terminal Drive (Loop Road), including the entrance and exit from Airport Drive, all four lanes in front of the terminal building, the bus lane and the entire loop. Olmstead Drive, from the split off of Airport Drive, to the east end at gate 4. Third Street and Tug Road, from Airport Drive and including south of Olmsted Drive. Access Road from Airport Drive into the parking lot at building 513. The highway connectors from Airport Drive to Route 230 and from Route 230 onto Airport Drive Contractor must be on site at first instance of accumulating snow or ice. All streets must be maintained throughout all storms with accumulating snow. Contractor will also perform snow and ice removal of the following parking lots in their entirety. Primary lots must be maintained fully for the duration of all storms with accumulating snow. Secondary lots will be cleared post storm OR when snowfall amounts are greater than 5” in accumulation. Primary lots include: The loading dock of the terminal. The managers parking lot at the terminal. The parking lot north side of building 513. South side of 513 including the fuel island and potassium acetate storage tanks 514 parking lots (side and rear of building) and access on all sides of the building The cell phone lot. Also, gate 60 must have access maintained throughout events. Wastewater treatment facility (access to and around all sides of the buildings) Secondary lots include: -Wastewater treatment facility, (western half of the lot) -Water treatment facility -Building 208, including the access in from Airport Drive and the double lane on the south side of the building. -Clear entrance area to Building 520 (Water Treatment Plant) and Building 521 (Airfield Winter Chemical Storage Igloo). All drains along roadways, parking lots and their entrances must be kept clear and free to allow melting snow to drain properly. SARAA will be responsible for pre-treating streets and overhead ramps prior to events. SARAA will provide salt and anti-skid material for contractor to use during events. Snowfall up to 12” – contractor will move to SARAA designated locations on the airport. Snowfall over 12” - contractor is responsible to move to a location offsite. Contractor will provide their own method (machinery) for loading salt and anti-skid material. If sub-contractors are required to complete additional tasks, a representative of the primary contractor must be on site at all times. All damages to grounds and property must be repaired to their original state and condition at the contractor’s expense.